Builders and renovation waste, priced on weight.
Rubble, tiles, timber, plasterboard and strip-out waste. This is the category where volume pricing breaks down, so we quote it properly instead.
Construction waste is dense. A single cubic yard of soil or hardcore weighs a substantial fraction of what any van of this size can safely carry, so on this kind of job the vehicle runs out of weight long before it runs out of space.
That is why we do not sell builders waste as a "quarter load". We quote against the actual weight and the gate fee at the receiving facility, which is the only way the number stays true when the van is on the weighbridge.
Plasterboard is separate again. Gypsum cannot be landfilled with general waste in the UK and has to be segregated, so it carries its own rate and needs to be kept apart from the rest of the load.
Typically included
- Brick, concrete and hardcore
- Tiles, ceramics and plaster
- Timber, skirting and stud work
- Bathroom and kitchen strip-outs
- Packaging, offcuts and site clearance
- Mixed renovation waste
Quoted separately
- Plasterboard — must be segregated
- Soil and excavated material
- Asbestos or suspected asbestos — licensed contractor only
- Paint, solvents and sealants
- Contaminated or unidentified material

Builders & renovation waste

What a standard collection costs.
These bands apply to light and bulky non-hazardous waste. Anything in the right-hand list above is priced from photos instead.
Dinkov Limited is not currently VAT-registered, so no VAT is added. The price we confirm is the total you pay.